Green hydrogen exports: test the contract before the market headline

New AFG research draft — 18 October 2026 UTC. Narrow hydrogen guide; the historical USD 50 billion green-energy thesis remains unverified.

India's National Green Hydrogen Mission identifies production, use and export of hydrogen and its derivatives as objectives. MNRE's mission overview separates demand creation, electrolyser manufacturing, hydrogen production, pilot projects and supporting infrastructure. These are different commercial activities; a public programme's outlay is not an export-sales estimate or a producer's contracted revenue. The mission document linked from the overview is dated January 2023. MNRE mission overview

Choose the product before building the export model. Selling hydrogen, a derivative, an electrolyser or a component requires different customers, logistics and acceptance criteria. Do not aggregate all four into an addressable market for one supplier.

For a proposed hydrogen or derivative contract, separate production cost from delivered cost. List electricity, plant utilisation, water, processing, storage, transport, terminal handling and the cost of meeting the buyer's evidence requirements. Test how lower utilisation affects unit cost rather than assuming the plant runs continuously at its rated capacity.

A simple hypothetical fixed-cost example: annual fixed costs of ₹100 crore divided by 100,000 tonnes equal ₹10,000 per tonne. At 50,000 tonnes, the fixed-cost allocation doubles to ₹20,000 per tonne, before energy, feedstock, logistics or financing. This is arithmetic, not an industry cost estimate. It shows why a forecast needs credible volume and offtake assumptions.

In the commercial file, distinguish a memorandum of understanding, an indicative inquiry and an enforceable purchase commitment. Record volume, delivery window, acceptance specification and what happens if certification or logistics slips. Treat capacity announcements separately from operating output and shipped exports.

Research limitations: no project economics, EU acceptance standard, renewable-fuel qualification, current incentive eligibility or buyer contract has been verified. The MNRE overview supports policy context only. It does not substantiate USD 50 billion of EU opportunity, and this draft must not retain that unsupported headline.